The interior of the New Art Studio has taken me a lot longer than I thought, but working full-time with my Hubby the Attorney (running a full-time law practice) keeps me busy almost 24/7. I try to fit a couple of hours out in the New Studio almost every evening, but it doesn’t always happen.
Here are the newest pics:
Coat #2 going in the cabinet doors for the south side, those are now done.
The contractor finished closing in the opening between the north and south sides, all boxed in nice and neat. Sorry the overhead lights caused a glare in this pic. Now lots more wood to paint!
Another pic of the cased opening
Was able to sell that extra bat of insulation, yay! got it out of my way.
I got the final coat on the south side back section of the walls. Once the cabinets and floor are done in this back section, my Hubby can build my counter top which will be under the cabinets for my two table top 110 kilns.
Got two coats of primer on the cabinet facing, the underside of the cabinet and right side of it, and then started the purple paint last night on the south side cabinets.
Spent lots and lots of time this week caulking the corners and seams between boards, very tedious, but it has to get done.
#new art studio #artstudio #picoftheday #instagood #instalike #dreamcometrue