It’s time for another update on the progress of the interior of the new Art Studio. I have continued painting walls in between the contractor working.
The 4×4 frame work has been put up to case the 11 foot opening we cut between the two modular units.
The exterior wall frame work was built to frame up the window opening on the right side unit, which will close up the end wall.
And on the left side unit the exterior wall framing was built to hold the door and a window.
I am still painting walls, adding the finishing coats.
Yay!!! The door, a window and an A/C unit are in on the left side!!! It is now much cooler in there
doing my painting, even though I am still running an electric cord from Rick’s wood shop for power.