New Art Studio Interior Is Coming Along

It’s time for another update on the progress of the interior of the new Art Studio.  I have continued painting walls in between the contractor working.

rimg1122The 4×4 frame work has been put up to case the 11 foot opening we cut between the two modular units.

img_0444The exterior wall frame work was built to frame up the window opening on the right side unit, which will close up the end wall.

img_0454And on the left side unit the exterior wall framing was built to hold the door and a window.

img_0462I am still painting walls, adding the finishing coats.

img_0508Yay!!!  The door, a window and an A/C unit are in on the left side!!!   It is now much cooler in there
doing my painting, even though I am still running an electric cord from Rick’s wood shop for power.

 

img_0524Here is a view of the door and window from the inside, still need the insulation and interior wall board hung, but it is progressing so nicely!!!  It is all so very exciting!!