It’s time for another update on the progress of the interior of the new Art Studio. I have continued painting walls in between the contractor working.
The 4×4 frame work has been put up to case the 11 foot opening we cut between the two modular units.
The exterior wall frame work was built to frame up the window opening on the right side unit, which will close up the end wall.
And on the left side unit the exterior wall framing was built to hold the door and a window.
I am still painting walls, adding the finishing coats.
Yay!!! The door, a window and an A/C unit are in on the left side!!! It is now much cooler in there
doing my painting, even though I am still running an electric cord from Rick’s wood shop for power.
Here is a view of the door and window from the inside, still need the insulation and interior wall board hung, but it is progressing so nicely!!! It is all so very exciting!!





And two coats of primer under the cabinet. They are ready for the new paint.


My hubby found some great bargains, he trolls all the Swap shops and CraigsList when we need something. We scored a brand new exterior door in the frame with the locks for $100 (you can see the door in the pic below sitting in the background). I needed two windows, one for each of the two front walls, found them, brand new never installed $50 each, another great score (sorry no pics of the windows yet).




